400 Tonne shackle cutting
Refinery Cracking Tower
South Pass 78A – Rig to Reef
Eugene Island – Rig to Reef
 
 
 
 
 
Projects
Eugene Island – Rig to Reef
Comments
The first 2 jackets were a Drilling Platform and a Production Platform. Both platforms were storm damaged therefore safety was paramount. DWCM gave remote cutting solution. An animation of the ‘Z’ cut is in the Applications section of this site.
Client
Anadarko
Area
Gulf of Mexico
Target Description
2 x Platforms
Target Size
8 of 51inch OD x 5/8inch wt jacket legs c/w 48inch OD x 1.25inch wt conductor.
Water Depth
85ft – 130ft swd
Power Mode
Surface