This platform was storm damaged. Remote operation of DWCM ensured the safety of the personnel during this project. A positive testimonial was forwarded to CUT by the Project manager referring to the
seamless integration with operations and the professionalism of the personnel.
Client
Tetra Technologies
Area
Gulf of Mexico
Target Description
1 x Platform
Target Size
The Jacket Legs were 46 inches with a layer of grout and 42inch OD piles