400 Tonne shackle cutting
Refinery Cracking Tower
South Pass 78A – Rig to Reef
Eugene Island – Rig to Reef
 
 
 
 
 
Projects
South Pass 78A – Rig to Reef
Comments
This platform was storm damaged. Remote operation of DWCM ensured the safety of the personnel during this project. A positive testimonial was forwarded to CUT by the Project manager referring to the seamless integration with operations and the professionalism of the personnel.
Client
Tetra Technologies
Area
Gulf of Mexico
Target Description
1 x Platform
Target Size
The Jacket Legs were 46 inches with a layer of grout and 42inch OD piles
Water Depth
110ft swd
Power Mode
Surface